Epoxy Flooring

Service

Epoxy Flooring

Dayanıklı ve endüstriyel zemin çözümleri. Epoksi zemin uygulamalarıyla mekanlarınıza uzun ömürlü koruma sağlıyoruz.

Free survey

Service Areas Kadıköy, İstanbul
Survey Free survey
Epoxy Flooring

Epoksi zemin; otopark, depo ve servis holünde şapın üstüne uygulanan kimyasal kaplamadır. Otopark renovationnda çoğu zaman çatlak tamiri, eğim, süzgeç ve epoksi birlikte planlanır. Buyaka ve Emaar mağaza işlerimiz Mall içindeki zemin ve hol uygulamasını bilir.

Surveyte nem, çatlak haritası ve araç yükü değerlendirilir. Kaplama, tamir kurumadan atılmaz.

Service

Scope of work

  • Çatlak ve nem kontrolü
  • Zımpara ve tamir
  • Epoksi veya endüstriyel kaplama
  • Kuruma ve teslim

Surveys are planned from our Göztepe office. We present a fixed-price proposal following on-site measurement.

Request a survey for this job

Transparency

Our Transparent Pricing Policy

All contract items are presented in detail from the start. Our transparent pricing policy ensures there are no unexpected costs.

Included

  • Nem ve çatlak haritası
  • Zımpara ve tamir
  • Epoksi veya endüstriyel kaplama
  • Çizgi ve bitiş detayı
  • Kuruma kontrolü ve teslim

Excluded

  • Yapısal döşeme güçlendirme
  • Otopark mekanik havalandırma renovation

From experience

Yağlı veya nemli şapa epoksi atmak kabarma demektir. Çekme ve nem testi takvimde ayrı daysdür.

Process

Our Project Process

01

Survey

Our specialist team inspects your space for 40–70 minutes on site, assessing moisture, shafts, lifts and structural conditions.

02

Contract

The scope is fixed in the contract. Any additional work is handled through a written variation order.

03

Site

From strip-out to completion, work is carried out by one coordinated team on a single programme.

04

Handover

A final inspection is carried out against a checklist and the project is completed with a handover record.

Works

Frames from this job

FAQ

Frequently asked

Can you coat over existing epoxy?

Sometimes, if the surface is sound and degreased. Most car parks need grinding and crack repair. Moisture and pull-off are discussed on survey.

Does a car-park refit shut the building?

We work in zones; night shifts can be planned. Closing the whole deck is not always required. Estate or mall approval is a survey item.

How long does an epoxy floor take?

One car-park deck, repair plus coating, is typically 7–18 days. Cure time is not shortened. Open ramps stop on wet days.

Is the epoxy survey free?

Yes. Car-park and epoxy surveys are free. A crack map is taken on the same visit.

Survey

Request a survey for this job