External Insulation

Service

External Insulation

Enerji verimli yapılar. Mantolama ve yalıtım uygulamalarıyla enerji tasarrufu ve konfor sağlıyoruz.

Free survey

Service Areas Kadıköy, İstanbul
Survey Free survey
External Insulation

Mantolama site kararı ve yönetmelik ister. Caddebostan, Göztepe ve Ümraniye apartman cephe işlerimizde iskele, renk ve ısı köprüsü birlikte çözülür.

Dış cephe mantolama levha, file ve sıva katmanlarından oluşur; boya ise son kattır. İkisi aynı iskelede yürüyebilir, teklifte ayrı kalem olarak yazılır. En verimli sonuç bina veya blok ölçeğinde mantolama ile elde edilir.

Service

Scope of work

  • Iskele ve yüzey
  • Isı yalıtım levhası
  • Filesi ve sıva
  • Façade boyası

Surveys are planned from our Göztepe office. We present a fixed-price proposal following on-site measurement.

Request a survey for this job

Transparency

Our Transparent Pricing Policy

All contract items are presented in detail from the start. Our transparent pricing policy ensures there are no unexpected costs.

Included

  • Survey ve ölçü
  • Uygulama
  • Kontrol
  • Teslim

Excluded

  • Ruhsat gerektiren yapısal değişiklikler

From experience

İşi yazılı kapsam olmadan başlatmak en sık görülen hatadır. Kapsamı, süreyi ve bedeli contractye yazıyoruz.

Process

Our Project Process

01

Survey

Our specialist team inspects your space for 40–70 minutes on site, assessing moisture, shafts, lifts and structural conditions.

02

Contract

The scope is fixed in the contract. Any additional work is handled through a written variation order.

03

Site

From strip-out to completion, work is carried out by one coordinated team on a single programme.

04

Handover

A final inspection is carried out against a checklist and the project is completed with a handover record.

Works

Frames from this job

FAQ

Frequently asked

Can you insulate a single apartment?

Not recommended — thermal bridging. The right scale is the building or block. On Caddebostan, Göztepe and Ümraniye jobs, scaffold, colour and code are solved together.

How long does external insulation take?

Typically 15–45 days depending on the block. Scaffold, boards, mesh, render and paint are separate stages. Estate approval and colour sign-off are requested before survey starts on site.

Is terrace waterproofing in the same package as façade insulation?

It is a separate item, but it can be run on the same site. Terrace membrane and façade board are different details. Survey gathers roof, terrace and façade on one drawing.

Is the façade survey free?

Yes. Façade surveys are free. A brief for the residents’ committee is written after measuring.

Survey

Request a survey for this job