Otel Interiorsu

Service

Otel Interiorsu

Konuk deneyimini güçlendiren profesyonel çözümler. Otel renovation ve interiors projelerinde kalite ve işlevselliği bir araya getiriyoruz.

Free survey

Service Areas Kadıköy, İstanbul
Survey Free survey
Otel Interiorsu

Otel design ve renovation tekrarlayan oda tipi, bathroom yalıtımı ve dolu tesis vardiyası ile yürür. Villa, cafe ve ticari iç mekân deneyimimiz bu disipline taşınır. Survey yerinde yapılır; teklif gerçek proje kapsamına göre yazılır.

Kat kat teslim ve sezon kapalı penceresi surveyte konuşulur. Wet roomler, konut bathroom paketindeki yalıtım sırasıyla uygulanır.

Service

Scope of work

  • Oda tipi tekrarı
  • Wet room yalıtımı
  • Lobi ve ortak alan
  • Gece vardiyası
  • Kat teslimi

Surveys are planned from our Göztepe office. We present a fixed-price proposal following on-site measurement.

Request a survey for this job

Transparency

Our Transparent Pricing Policy

All contract items are presented in detail from the start. Our transparent pricing policy ensures there are no unexpected costs.

Included

  • Oda tipi ölçü ve tekrarlayan imalat
  • Wet room yalıtımı ve seramik
  • Lobi ve koridor bitişleri
  • Gece / kat vardiyası
  • Kat handover record

Excluded

  • Otel işletme mobilyası ve tekstil bedeli
  • Kitchen endüstriyel ekipman

From experience

Dolu tesiste kat kapatmadan gürültülü strip-out, misafir şikâyeti ve iş durması demektir. Kanat veya kat sırası surveyte yazılır.

Process

Our Project Process

01

Survey

Our specialist team inspects your space for 40–70 minutes on site, assessing moisture, shafts, lifts and structural conditions.

02

Contract

The scope is fixed in the contract. Any additional work is handled through a written variation order.

03

Site

From strip-out to completion, work is carried out by one coordinated team on a single programme.

04

Handover

A final inspection is carried out against a checklist and the project is completed with a handover record.

Works

Frames from this job

FAQ

Frequently asked

Can a hotel be renovated while open?

Yes. A floor or wing is closed and noisy work moves to night. An empty building is faster; that option is a separate line on the quote.

How long does a hotel refit take?

One floor of rooms and wet rooms is typically 3–6 weeks; lobby and shared areas 2–5. Repeating room types shorten fabrication; that is settled on survey.

Do you have hotel references?

Our book is villas, cafés and commercial interiors. Hotel work is surveyed with the same commercial discipline; we do not invent a hotel list.

Is the hotel survey free?

Yes. Surveys of lodging buildings are free. Season window and floor handover are discussed on the same visit.

Survey

Request a survey for this job